b stack radar
Asta Powerproject logo

Best Asta Powerproject Alternatives (2026): 10+ options compared

The table lists tools that share a category with Asta Powerproject, picked from the highest scoring and listed closest matches first: most shared categories, then the most of Asta Powerproject's features in those categories, then the most audiences both suit, then our score. Each score is for the category that alternative shares with Asta Powerproject. The tools ranked just above and below Asta Powerproject in Project Management are listed further down. Costs are estimates for monthly billing based on each tool's listed plans. Our methodology

Team size: 10 users
#ToolScoreFree tierStarting priceEst. monthly costLinks
Asta Powerproject logo
Asta Powerproject (current)
6.3/10in Industrial & Infrastructure SoftwareYesContact salesFreeProjectViewer
1
Oracle Primavera P6 logo
Oracle Primavera P6

Enterprise project and portfolio scheduling software from Oracle, used for critical path planning, resources and cost control on large construction, engineering and energy projects.

  • Better at: Higher Scalability score (9/10 vs 7/10)
  • Better at: Higher Security score (7/10 vs 5/10)
  • Gives up: Has a free plan (Oracle Primavera P6 does not)
6.2/10in Industrial & Infrastructure SoftwareNoContact salesContact for pricing
2
PMWEB logo
PMWEB

PMWEB is web-based capital project and portfolio management software for owner-operators. It covers budgeting, cost control, scheduling, document control and workflows.

  • Better at: Higher Security score (8/10 vs 5/10)
  • Better at: Higher Scalability score (8/10 vs 7/10)
  • Gives up: Has a free plan (PMWEB does not)
6.2/10in Industrial & Infrastructure SoftwareNoContact salesContact for pricing
3
Trimble Tilos logo
Trimble Tilos

Time-location scheduling software from Trimble for linear infrastructure projects such as highways, railways, pipelines and tunnels, used by contractors and civil engineers.

  • Gives up: Has a free plan (Trimble Tilos does not)
5.9/10in Industrial & Infrastructure SoftwareNoContact salesContact for pricing
4
InEight logo
InEight

InEight is a modular project controls platform for capital construction. Owners, contractors and engineering firms use it to manage cost, schedule, estimating, contracts and documents.

  • Better at: Higher Scalability score (9/10 vs 7/10)
  • Better at: Higher Analytics score (8/10 vs 7/10)
  • Gives up: Has a free plan (InEight does not)
6.3/10in Industrial & Infrastructure SoftwareNoContact salesContact for pricing
5
Mastt logo
Mastt

Mastt is AI-assisted capital project and program management software that lets owner-side construction teams track cost, contracts, payments, risk, schedule and reporting in one place.

  • Better at: Higher Ease of Use score (7/10 vs 5/10)
  • Better at: Higher Security score (6/10 vs 5/10)
  • Gives up: Higher Integration score (7/10 vs 4/10)
5.8/10in Industrial & Infrastructure SoftwareYes$165/moFreeStarter
6
Bolt logo
Bolt

Bolt from ECI Software Solutions is cloud and mobile job management and scheduling software for residential trade contractors who work for production homebuilders.

  • Better at: Higher Ease of Use score (7/10 vs 5/10)
  • Better at: Better fit for field teams (8/10 vs 5/10)
  • Gives up: Has a free plan (Bolt does not)
5.2/10in Industrial & Infrastructure SoftwareNoContact salesContact for pricing
7
Autodesk Construction Cloud logo
Autodesk Construction Cloud

Autodesk's construction management cloud, renamed Autodesk Forma in 2026. It covers document control, BIM coordination, preconstruction, field quality and safety, and closeout for contractors and design teams.

  • Better at: Higher Scalability score (9/10 vs 7/10)
  • Better at: Higher Security score (7/10 vs 5/10)
  • Gives up: Has a free plan (Autodesk Construction Cloud does not)
6.2/10in Industrial & Infrastructure SoftwareNo$100/user/mo$1,000/moForma Build Essentials
8
Dashpivot logo
Dashpivot

Dashpivot by Sitemate is a no-code forms and workflow platform that lets construction and infrastructure teams run safety, quality, and field reporting digitally.

  • Better at: Higher Security score (7/10 vs 5/10)
  • Better at: Higher Customization score (9/10 vs 7/10)
  • Gives up: Higher Analytics score (7/10 vs 6/10)
7/10in Industrial & Infrastructure SoftwareYes$25.20/user/moFreeFree
9
BIMcollab logo
BIMcollab

Cloud platform for BIM coordination, issue management, document control and model checking, used by construction, engineering and building-owner teams.

  • Better at: Higher Cost score (7/10 vs 4/10)
  • Better at: Higher Ease of Use score (7/10 vs 5/10)
  • Gives up: Has a free plan (BIMcollab does not)
6.8/10in Industrial & Infrastructure SoftwareNo€19/user/mo€190/moBasic
10
OmTrak logo
OmTrak

OmTrak is WebFM cloud software that construction owners, contractors, and facility managers use for document control, handover, defects, and maintenance.

  • Better at: Higher Security score (7/10 vs 5/10)
  • Better at: Higher Cost score (5/10 vs 4/10)
  • Gives up: Has a free plan (OmTrak does not)
6/10in Industrial & Infrastructure SoftwareNoContact salesContact for pricing
11
FARO Sphere XG logo
FARO Sphere XG

FARO Sphere XG is a cloud platform where construction, operations and geospatial teams process, view, measure and share point clouds, 360 photos and BIM models.

  • Better at: Higher Security score (8/10 vs 5/10)
  • Better at: Higher Ease of Use score (7/10 vs 5/10)
  • Gives up: Has a free plan (FARO Sphere XG does not)
5.9/10in Industrial & Infrastructure SoftwareNoContact salesContact for pricing
12
Trimble Connect logo
Trimble Connect

Trimble Connect is a cloud common data environment for construction and engineering teams to view, coordinate, and share 2D/3D BIM models and project files.

  • Better at: Higher Security score (7/10 vs 5/10)
  • Better at: Higher Cost score (6/10 vs 4/10)
  • Gives up: Higher Analytics score (7/10 vs 5/10)
5.7/10in Industrial & Infrastructure SoftwareYes$349/user/moFreeFree
13
BEXEL Manager logo
BEXEL Manager

openBIM platform for construction and facility teams covering 3D model review, 4D scheduling, 5D cost estimation, a common data environment and BIM-based facility management.

  • Better at: Higher Cost score (6/10 vs 4/10)
  • Gives up: Has a free plan (BEXEL Manager does not)
5.8/10in Industrial & Infrastructure SoftwareNo$560/user/mo$5,600/moBEXEL Manager Lite
14
Procore logo
Procore

Cloud construction management platform that gives owners, general contractors and specialty contractors project management, drawings, quality and safety, and financial tools.

  • Better at: Higher Scalability score (9/10 vs 7/10)
  • Better at: Higher Security score (7/10 vs 5/10)
  • Gives up: Has a free plan (Procore does not)
6.8/10in Industrial & Infrastructure SoftwareNoContact salesContact for pricing
15
INGENIOUS.BUILD logo
INGENIOUS.BUILD

Cloud construction project management platform that connects owners, developers, contractors and designers to share financials, documents and construction administration from preconstruction to closeout.

  • Better at: Higher Security score (8/10 vs 5/10)
  • Better at: Higher Ease of Use score (7/10 vs 5/10)
  • Gives up: Higher Support score (7/10 vs 5/10)
6.3/10in Industrial & Infrastructure SoftwareYesContact salesFreeBasic (external collaborators)

Prices from each vendor's published plans, last updated November 2026. How we collect prices

Free alternatives to Asta Powerproject

Ranked near Asta Powerproject in Project Management

Asta Powerproject is #260 in Project Management by our score. These are the tools ranked just above and below it. See Asta Powerproject in the Project Management list

RankToolScoreStarting priceCost for 10 users
#257
Notion Calendar logo
Notion Calendar
6/10in Project ManagementNot listedFreeNotion Calendar
#258
nTask logo
nTask
6/10in Project Management$4/user/mo$40/moPremium
#259
ActiveCollab logo
ActiveCollab
6/10in Project Management$3.50/user/mo$110/moPro
#261
Fortes QuoJob logo
Fortes QuoJob
6/10in Project Management€20/user/mo€200/moRental (cloud)
#262
Whimsical logo
Whimsical
6/10in Project Management$12/user/moFreeFree
#263
Render Networks logo
Render Networks
6/10in Project ManagementContact salesContact for pricing

Asta Powerproject alternatives FAQs

Oracle Primavera P6 is the closest match to Asta Powerproject on our list, with a score of 6.2/10 on our Industrial & Infrastructure Software criteria. Where it beats Asta Powerproject: higher Scalability score (9/10 vs 7/10).

Yes. The closest matches with a free plan are Mastt, Dashpivot and Trimble Connect.

Asta Powerproject is the cheapest of the tools listed here priced in USD for 10 users: free on its ProjectViewer plan. The cheapest alternative, Mastt, costs the same.

Dashpivot, BIMcollab and Procore score higher than Asta Powerproject, each in the category it shares with Asta Powerproject: Dashpivot 7/10 against 6.3/10 in Industrial & Infrastructure Software; BIMcollab 6.8/10 against 6.3/10 in Industrial & Infrastructure Software; Procore 6.8/10 against 6.3/10 in Industrial & Infrastructure Software.