Asta Powerproject vs Dashpivot (2026): Pricing, Features & Verdict

Dashpivot is our pick, scoring 7/10 against 6.3/10 for Asta Powerproject on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Security score (7/10 vs 5/10). For 10 users, Asta Powerproject and Dashpivot are both free; both Asta Powerproject and Dashpivot have a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

Dashpivot logo

Dashpivot

7/10

Winner

Dashpivot by Sitemate is a no-code forms and workflow platform that lets construction and infrastructure teams run safety, quality, and field reporting digitally.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
Dashpivot logo
Dashpivot
Scores
Overall Rating6.3/107/10
Scalability7/107/10
Analytics7/106/10
Support7/108/10
Security5/107/10
Cost4/105/10
Customization7/109/10
Ease of Use5/107/10
Integration7/106/10
Pricing
Free planYesYes
Cheapest paid planContact for pricing$25.20/user/mo
Standard
Estimated cost for 10 usersFree
ProjectViewer
Free
Free
Features
Inspection ChecklistsNot listed
Offline Field AppNot listed
Safety and ComplianceNot listed
More features
App integrationsNot listed
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
SchedulingNot listed
ReportingNot listed

Asta Powerproject vs Dashpivot cost by team size

Asta Powerproject and Dashpivot cost the same from 5 users.

Team sizeAsta PowerprojectDashpivot
1 userContact for pricingFreeFree
5 usersFreeProjectViewerFreeFree
10 usersFreeProjectViewerFreeFree
25 usersFreeProjectViewerFreeFree
50 usersFreeProjectViewerFreeFree

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and Dashpivot suit

Dashpivot fits field teams better than Asta Powerproject.

AudienceAsta PowerprojectDashpivot
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.8/10The offline mobile app captures forms and GPS-tagged photos on site.
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.9/10Built for construction field reporting, and around half of Capterra reviewers work in construction.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.7/10Sitemate sells it to infrastructure and civil teams for quality and test records.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.6/10Pricing is custom above 50 users and minimum licence counts depend on company size, with volume discounts on 1 to 5 year terms.
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.4/10A free plan and an offline mobile app can capture site forms, and minimum licences scaled to company size assume a larger crew.
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.6/10Teams run inspections, test plans, site diaries, safety checks and conditional approval workflows, including offline on site.
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.6/10There is a free plan and many reviewers are small companies, but per-user minimums apply.
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.3/10A free plan exists, and minimum licence counts depend on company size for construction, civil and mining forms.
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.4/10Flowsite connects forms to Xero, QuickBooks and Power BI, and the product itself is field reporting.
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.7/10A third-party listing shows Standard through Platinum at about 25 to 85 USD per user per month on annual billing, with custom pricing above 50 users.
Accountants and BookkeepersNot rated4/10Flowsite can send field records to Xero and QuickBooks, and there is no multi-client practice ledger or tax workflow.
Maintenance TeamsNot rated5/10Templates cover plant and equipment records and inspections with offline mobile capture, and the notes say there is no asset registry, spare-parts tracking or sensor integration.
ManufacturingNot rated3/10The product replaces paper forms on construction, civil infrastructure and mining sites, and it has no CMMS or production-line features.
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Higher Analytics score (7/10 vs 6/10)
  • Higher Integration score (7/10 vs 6/10)

Dashpivot logo
Why choose Dashpivot

  • Higher Security score (7/10 vs 5/10)
  • Higher Customization score (9/10 vs 7/10)
  • Better fit for field teams (8/10 vs 5/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

Dashpivot logo
Dashpivot

Pros

  • Reviewers repeatedly praise how far forms can be customised, including calculations, logic, and automation.
  • The mobile app captures forms and GPS-tagged photos offline and uploads them automatically when the device reconnects.
  • A free plan lets teams try the product before buying.
  • Flowsite connects Dashpivot to accounting and BI tools such as Xero, QuickBooks, and Power BI without code.
  • Sitemate lists SOC 2 Type II, SSO, role-based access, and full audit trails.

Cons

  • Per-user minimum licence counts depend on company size, so small teams may pay for unused seats.
  • A reviewer reported they could not go back and amend forms after approval.
  • Some reviewers say the app is slow to load in certain situations.
  • It has no CMMS-style asset registry, spare parts tracking, or sensor integration.
  • There is no free trial of paid tiers, and exact prices are set by an account manager.

Not sold on either?

Frequently Asked Questions

Dashpivot scores higher on our Industrial & Infrastructure Software criteria: 7/10 against 6.3/10 for Asta Powerproject. The largest gap is in Customization: 7/10 for Asta Powerproject and 9/10 for Dashpivot.

Both are free for 10 users.

Yes, both Asta Powerproject and Dashpivot have a free plan.

Dashpivot is the better fit for field teams: we rate it 8/10 for them, against 5/10 for Asta Powerproject.