
Asta Powerproject
6.2/10A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.
Data last updated November 2026 · Our methodology
Overview
Asta Powerproject is a specialist construction planning application from Eleco plc, formerly Elecosoft. Eleco acquired Asta Group and its Powerproject software in 2006. Planners use it to build Gantt programmes with critical path and float analysis, multiple calendars, constraints and baselines, and schedule quality checks based on DCMA metrics. It also handles resource planning with skills, shifts and work rates, cost loading, earned value, and what-if scenarios. Its BIM module links the programme to 3D models for 4D planning. It is popular with UK contractors and works for both large and small jobs. Native files use the .pp format. It also imports and exports Primavera P6 XER and XML files and Microsoft Project files, which helps when a contract requires a P6 schedule. Stakeholders can open plans in the free ProjectViewer without a licence. Licensing comes as a single-user licence, a concurrent server licence, or a SaaS cloud subscription. Eleco does not publish prices. Third-party sources put a subscription at about 1,300 to 1,700 US dollars per user per year, and concurrent licences cost more. Asta Siteprogress for mobile progress updates, Asta Enterprise for shared resource pools, Asta Vision dashboards, API access, and training are all licensed separately. A 14-day free trial is available. The main limitation is that the desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription. It also takes real training to learn, so editing usually stays with a few trained planners while field teams depend on add-ons.
Our Rating
Project Management6/10
Industrial & Infrastructure Software6.3/10
Who Asta Powerproject is best for
Best software for ConstructionGood fit
Built and marketed for construction programme planning, with 4D BIM and a site progress app.
Critical path, resource and earned value tools suit engineering and infrastructure planners.
Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.
It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.
Less suited
Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.
Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.
The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.
Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.
The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.
Per-seat cost and training needs make it a poor fit for occasional individual users.
Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.
Pros & Cons
Pros
- Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
- Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
- The BIM module links programmes to 3D models for 4D planning.
- The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
- Concurrent licensing lowers the per-user cost for planning teams that share seats.
Cons
- Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
- The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
- Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
- Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
- Exporting to Microsoft Project can lose hammock tasks and custom calendars.
Key Features
Asta Powerproject Pricing
Concurrent server licence
- Lower cost per user for teams
- Licences shared across users and devices
SaaS cloud subscription
- Required for Mac access
- Contact sales for pricing
Single user licence
- Windows desktop
- Tied to one user on one device
- Third parties estimate about 1,320 to 1,675 USD per user per year
Frequently Asked Questions
Yes. Eleco offers a 14-day free trial through a request form.
The desktop version runs only on Windows. Mac users need the SaaS cloud subscription.
Yes. It imports and exports P6 XER and XML files and Microsoft Project XML and MPP files. Some items, such as hammock tasks, may not carry over to Microsoft Project.
Eleco does not publish prices. Third-party sources put a subscription at about 1,320 to 1,675 USD per user per year. Concurrent licences and add-ons cost extra.
Yes. The free ProjectViewer opens plans without a paid licence.
Support packages cover technical, installation and activation help, a help desk, and web tutorials. Classroom and online training are also available.
Similar Tools
See all alternatives
Enterprise project and portfolio scheduling software from Oracle, used for critical path planning, resources and cost control on large construction, engineering and energy projects.

PMWEB is web-based capital project and portfolio management software for owner-operators. It covers budgeting, cost control, scheduling, document control and workflows.

Time-location scheduling software from Trimble for linear infrastructure projects such as highways, railways, pipelines and tunnels, used by contractors and civil engineers.
Ranked near Asta Powerproject in Project Management
See Asta Powerproject in the listAsta Powerproject is #260 in Project Management by our score.





