b stack radar

Asta Powerproject vs Trimble Connect (2026): Pricing, Features & Verdict

Asta Powerproject is our pick, scoring 6.3/10 against 5.7/10 for Trimble Connect on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Analytics score (7/10 vs 5/10). For 10 users, Asta Powerproject and Trimble Connect are both free; both Asta Powerproject and Trimble Connect have a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

Winner

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

Trimble Connect logo

Trimble Connect

5.7/10

Trimble Connect is a cloud common data environment for construction and engineering teams to view, coordinate, and share 2D/3D BIM models and project files.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
Trimble Connect logo
Trimble Connect
Scores
Overall Rating6.3/105.7/10
Scalability7/107/10
Analytics7/105/10
Support7/105/10
Security5/107/10
Cost4/106/10
Customization7/105/10
Ease of Use5/105/10
Integration7/107/10
Pricing
Free planYesYes
Cheapest paid planContact for pricing$349/user/mo
Pro
Estimated cost for 10 usersFree
ProjectViewer
Free
Free
Features
Digital TwinNot listed
Document ControlNot listed
More features
App integrationsNot listed
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
SchedulingNot listed
ReportingNot listed

Asta Powerproject vs Trimble Connect cost by team size

Asta Powerproject and Trimble Connect cost the same from 5 users.

Team sizeAsta PowerprojectTrimble Connect
1 userContact for pricingFreeFree
5 usersFreeProjectViewerFreeFree
10 usersFreeProjectViewerFreeFree
25 usersFreeProjectViewerFreeFree
50 usersFreeProjectViewerFreeFree

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and Trimble Connect suit

AudienceAsta PowerprojectTrimble Connect
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.9/10Trimble built it as a common data environment for construction project coordination.
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.6/10Mobile apps let field staff view models, but users report that mobile performance is inconsistent.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.8/10It supports BIM model coordination with Tekla, SketchUp, Revit, and IFC files.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.7/10Volume pricing for 30 or more users and enterprise governance are offered.
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.Not rated
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.Not rated
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.Not rated
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.Not rated
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.Not rated

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Higher Analytics score (7/10 vs 5/10)
  • Higher Support score (7/10 vs 5/10)

Trimble Connect logo
Why choose Trimble Connect

  • Higher Security score (7/10 vs 5/10)
  • Higher Cost score (6/10 vs 4/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

Trimble Connect logo
Trimble Connect

Pros

  • Opens more than 45 file types, including IFC and geospatial formats, so mixed-vendor BIM teams can coordinate in one place.
  • Connects natively with Trimble tools such as Tekla, SketchUp, ProjectSight, and FieldPoints.
  • A free tier still covers viewing, coordination, and file sharing.
  • A 30-day trial includes the full Innovate feature set.

Cons

  • In 2025, forum users reported slow web app and 3D viewer loading, plus freezes.
  • Measuring tools in the 3D viewer have broken in past releases.
  • Reviewers say the technical interface takes time to learn and that mobile markups can lag.
  • A Capterra reviewer said the desktop app needs an active internet connection to run.

Not sold on either?

Frequently Asked Questions

Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 5.7/10 for Trimble Connect. The largest gap is in Analytics: 7/10 for Asta Powerproject and 5/10 for Trimble Connect.

Both are free for 10 users.

Yes, both Asta Powerproject and Trimble Connect have a free plan.

Related Comparisons