b stack radar

Asta Powerproject vs FARO Sphere XG (2026): Pricing, Features & Verdict

Asta Powerproject is our pick, scoring 6.3/10 against 5.9/10 for FARO Sphere XG on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Analytics score (7/10 vs 5/10). Only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

Winner

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

FARO Sphere XG logo

FARO Sphere XG

5.9/10

FARO Sphere XG is a cloud platform where construction, operations and geospatial teams process, view, measure and share point clouds, 360 photos and BIM models.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
FARO Sphere XG logo
FARO Sphere XG
Scores
Overall Rating6.3/105.9/10
Scalability7/107/10
Analytics7/105/10
Support7/107/10
Security5/108/10
Cost4/104/10
Customization7/105/10
Ease of Use5/107/10
Integration7/105/10
Pricing
Free planYesNo
Cheapest paid planContact for pricingContact for pricing
Estimated cost for 10 usersFree
ProjectViewer
Contact for pricing
Features
Digital TwinNot listed
LiDAR ProcessingNot listed
More features
App integrationsNot listed
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
SchedulingNot listed
ReportingNot listed

Asta Powerproject vs FARO Sphere XG cost by team size

Team sizeAsta PowerprojectFARO Sphere XG
1 userContact for pricingContact for pricing
5 usersFreeProjectViewerContact for pricing
10 usersFreeProjectViewerContact for pricing
25 usersFreeProjectViewerContact for pricing
50 usersFreeProjectViewerContact for pricing

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and FARO Sphere XG suit

AudienceAsta PowerprojectFARO Sphere XG
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.9/10Its floor plan progress tracking, 360 jobsite capture and record-keeping for disputes are aimed at construction projects.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.7/10Teams can align georeferenced models with point clouds to check for deviations and clashes.
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.6/10FARO markets it to operations and facility teams for remote site visibility.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.7/10The Enterprise package adds multi-project dashboards, single sign-on and tiered user management.
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.Not rated
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.Not rated
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.Not rated
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.Not rated
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.Not rated

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (FARO Sphere XG does not)
  • Higher Analytics score (7/10 vs 5/10)
  • Higher Customization score (7/10 vs 5/10)

FARO Sphere XG logo
Why choose FARO Sphere XG

  • Higher Security score (8/10 vs 5/10)
  • Higher Ease of Use score (7/10 vs 5/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

FARO Sphere XG logo
FARO Sphere XG

Pros

  • It accepts data from FARO terrestrial and mobile scanners, from iPhone LiDAR and from 360 cameras, so mixed capture methods end up in one cloud project.
  • The Stream app pre-registers Orbis scans in the field, which reduces failed registrations and repeat site visits.
  • Scans are placed on floor plans and sorted by date, which suits progress documentation and dispute records.
  • A SOC 2 Type 2 examination by A-LIGN covers FARO Sphere and HoloBuilder.
  • Capterra reviewers give it a high average rating and mention responsive customer support.

Cons

  • There is no public pricing. Every package needs a custom quote from FARO.
  • It works best with FARO hardware, and third-party integrations are not well documented.
  • Some reviewers say the editing layout is hard to navigate, and others say pricing could be better.
  • It has no maintenance, work-order or asset-registry functions for industrial operations.

Not sold on either?

Air Inspection Automation (AiA) logo

Air Inspection Automation (AiA)Our product

Plans DJI drone inspection missions for power line towers from LiDAR scans: it finds the towers, places photo stops, checks clearance, and splits the route into battery flights.

Made by the team behind b stack radar. Shown here because it fits this topic. It is not part of our rankings. How we rank tools

Frequently Asked Questions

Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 5.9/10 for FARO Sphere XG. The largest gap is in Security: 5/10 for Asta Powerproject and 8/10 for FARO Sphere XG.

Asta Powerproject has a free plan; FARO Sphere XG does not list one.

Related Comparisons