Asta Powerproject vs BEXEL Manager (2026): Pricing, Features & Verdict
Asta Powerproject is our pick, scoring 6.3/10 against 5.8/10 for BEXEL Manager on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Support score (7/10 vs 5/10). For 10 users, Asta Powerproject is free, against $10,500/mo for BEXEL Manager; only Asta Powerproject has a free plan.
Last updated: November 2026

Asta Powerproject
6.3/10
A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

BEXEL Manager
5.8/10
openBIM platform for construction and facility teams covering 3D model review, 4D scheduling, 5D cost estimation, a common data environment and BIM-based facility management.
Feature-by-Feature Comparison
| Feature | ![]() | ![]() |
|---|---|---|
| Scores | ||
| Overall Rating | 6.3/10 | 5.8/10 |
| Scalability | 7/10 | 7/10 |
| Analytics | 7/10 | 7/10 |
| Support | 7/10 | 5/10 |
| Security | 5/10 | 5/10 |
| Cost | 4/10 | 6/10 |
| Customization | 7/10 | 6/10 |
| Ease of Use | 5/10 | 5/10 |
| Integration | 7/10 | 6/10 |
| Pricing | ||
| Free plan | Yes | No |
| Cheapest paid plan | Contact for pricing | $560/user/mo BEXEL Manager Lite |
| Estimated cost for 10 users | Free ProjectViewer | $10,500/mo BEXEL Engineer |
| Features | ||
| Digital Twin | Not listed | |
| Document Control | Not listed | |
| Engineering Design | Not listed | |
| GIS and Mapping | Not listed | |
| Inspection Checklists | Not listed | |
| Preventive Maintenance | Not listed | |
| More features | ||
| App integrations | Not listed | |
| Spreadsheet interface | Not listed | |
| Dashboards | Not listed | |
| Timeline view | Not listed | |
| Task management | Not listed | |
| Gantt charts | Not listed | |
| Scheduling | Not listed | |
| Reporting | Not listed | |
Asta Powerproject vs BEXEL Manager cost by team size
Asta Powerproject costs less from 5 users.
| Team size | Asta Powerproject | BEXEL Manager |
|---|---|---|
| 1 user | Contact for pricing | $1,050/moBEXEL Engineer |
| 5 users | FreeProjectViewer | $5,250/moBEXEL Engineer |
| 10 users | FreeProjectViewer | $10,500/moBEXEL Engineer |
| 25 users | FreeProjectViewer | $26,250/moBEXEL Engineer |
| 50 users | FreeProjectViewer | $52,500/moBEXEL Engineer |
The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.
Who Asta Powerproject and BEXEL Manager suit
| Audience | Asta Powerproject | BEXEL Manager |
|---|---|---|
| Construction | 10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app. | 9/10Its 4D scheduling, 5D cost, clash detection and takeoff features are built for contractors. |
| Engineering Firms | 8/10Critical path, resource and earned value tools suit engineering and infrastructure planners. | 7/10The Engineer license and design review tools are aimed at designers. |
| Field Teams | 5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner. | 6/10BEXEL FM uses a mobile app and inspection checklists on the building model, alongside desktop tools for clash detection and quantity takeoff. |
| Freelancers | 3/10Per-seat cost and training needs make it a poor fit for occasional individual users. | 4/10The Engineer plan is listed at 1,050 USD per user per year, and the platform is described for contractors, owners and engineering firms on large BIM projects. |
| Mid-Market | 7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools. | 6/10List prices start at 560 USD per user per year, and cloud modules are priced separately for a single project under 50 million EUR or for unlimited projects. |
| Operations Teams | 5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation. | 6/10The common data environment handles documents and approvals, and the portfolio manager adds BI dashboards plus the FM module for owners. |
| Remote Teams | 4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer. | 5/10Cloud modules include a web viewer, a BCF server for issue collaboration and a common data environment so distributed project teams can review the same model. |
| Small Business | 5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training. | 4/10Manager Lite costs 560 USD per user per year on annual billing, and the tool is positioned for large BIM projects run by contractors, owners and engineering firms. |
| Startups | 2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company. | 3/10Licences are annual per user, from 560 USD to 2,800 USD before separate cloud modules, for teams already working with IFC models, 4D schedules and 5D estimates. |
| Enterprise | 7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall. | 7/10The Enterprise plan offers unlimited users across all modules, and external contractors can be given licenses. |
| Finance Teams | 4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system. | 4/105D cost estimation and quantity takeoff price the construction project from the BIM model, and the product has no general ledger or invoicing. |
| Maintenance Teams | Not rated | 6/10The FM module carries COBie data and sensor feeds into maintenance plans on a digital twin, and the notes say plant-floor teams that want a standalone CMMS are a weaker fit. |
| Manufacturing | Not rated | 3/10The product is an openBIM platform for building projects and facility management, and the notes say it is less suited to plant-floor maintenance teams that want a standalone CMMS. |
| Real Estate | Not rated | 6/10BEXEL FM and the portfolio dashboards help owners run buildings from BIM data. |
Which One Should You Choose?
Why choose Asta Powerproject

- Has a free plan (BEXEL Manager does not)
- Lower estimated cost for 10 users: Free vs $10,500/mo
- Higher Support score (7/10 vs 5/10)
- Higher Customization score (7/10 vs 6/10)
Why choose BEXEL Manager

- Higher Cost score (6/10 vs 4/10)
Pros & Cons
Asta Powerproject

Pros
- Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
- Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
- The BIM module links programmes to 3D models for 4D planning.
- The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
- Concurrent licensing lowers the per-user cost for planning teams that share seats.
Cons
- Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
- The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
- Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
- Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
- Exporting to Microsoft Project can lose hammock tasks and custom calendars.
BEXEL Manager

Pros
- List prices are published for each module, starting at 560 USD per user per year for Manager Lite.
- One tool covers clash detection, quantity takeoff, 4D scheduling and 5D costing, so contractors do not need separate point tools.
- Built on openBIM and IFC, with BCF and IDS checks for working across vendors.
- The FM module carries BIM and COBie data into maintenance plans with sensor integration and a mobile app.
- Single-project cloud licenses at lower rates suit projects valued under 50M EUR.
Cons
- Very few independent user reviews are available on Capterra, SourceForge or Slashdot.
- Billing is annual only, and no monthly plan is published.
- It does not author models, so a separate BIM authoring tool is still needed.
- Security certifications are not described beyond an ISO logo on the home page.
Not sold on either?
Frequently Asked Questions
Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 5.8/10 for BEXEL Manager. The largest gap is in Cost: 4/10 for Asta Powerproject and 6/10 for BEXEL Manager.
Asta Powerproject costs less for 10 users: free on its ProjectViewer plan, against about $10,500/mo on its BEXEL Engineer plan for BEXEL Manager, billed monthly.
Asta Powerproject has a free plan; BEXEL Manager does not list one.




