b stack radar

Asta Powerproject vs InEight (2026): Pricing, Features & Verdict

Asta Powerproject and InEight both score 6.3/10 on our Industrial & Infrastructure Software criteria. Only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

InEight logo

InEight

6.3/10

InEight is a modular project controls platform for capital construction. Owners, contractors and engineering firms use it to manage cost, schedule, estimating, contracts and documents.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
InEight logo
InEight
Scores
Overall Rating6.3/106.3/10
Scalability7/109/10
Analytics7/108/10
Support7/106/10
Security5/106/10
Cost4/103/10
Customization7/107/10
Ease of Use5/104/10
Integration7/107/10
Pricing
Free planYesNo
Cheapest paid planContact for pricingContact for pricing
Estimated cost for 10 usersFree
ProjectViewer
Contact for pricing
Features
App integrations
Spreadsheet interfaceNot listed
Dashboards
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
Scheduling
Reporting
File sharingNot listed
Collaboration toolsNot listed

Asta Powerproject vs InEight cost by team size

Team sizeAsta PowerprojectInEight
1 userContact for pricingContact for pricing
5 usersFreeProjectViewerContact for pricing
10 usersFreeProjectViewerContact for pricing
25 usersFreeProjectViewerContact for pricing
50 usersFreeProjectViewerContact for pricing

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and InEight suit

Asta Powerproject fits small business better; InEight fits enterprise better.

AudienceAsta PowerprojectInEight
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.2/10It is complex, quote-only software designed for large projects.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.9/10It is aimed at large, complex programs with ERP integration and custom enterprise pricing.
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.10/10It is built specifically for capital construction project controls.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.8/10Engineering firms such as AECOM and WSP are named customers.
Energy CompaniesNot rated8/10It is used on power, nuclear, and oil and gas projects, and Pattern Energy is a named customer.
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.Not rated
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.Not rated
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.Not rated
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.Not rated
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.Not rated

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (InEight does not)
  • Higher Support score (7/10 vs 6/10)
  • Higher Cost score (4/10 vs 3/10)
  • Better fit for small business (5/10 vs 2/10)

InEight logo
Why choose InEight

  • Higher Scalability score (9/10 vs 7/10)
  • Higher Analytics score (8/10 vs 7/10)
  • Better fit for enterprise (9/10 vs 7/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

InEight logo
InEight

Pros

  • Cost, schedule, contracts and documents run on one shared data model, which reviewers say replaces scattered spreadsheets.
  • Estimating draws on historical cost data, and scheduling supports what-if scenarios for bids and plans.
  • Look-ahead planning ties field schedules to the master CPM schedule.
  • More than 200 standard construction reports plus customizable dashboards, according to third-party listings.
  • ERP integration syncs budgets, commitments and payments.

Cons

  • Reviewers report an initial learning curve and complex navigation.
  • No public pricing, and all plans require a custom quote.
  • Some users want more comprehensive reporting.
  • Too heavy for general business or small-team project management.

Not sold on either?

Frequently Asked Questions

Asta Powerproject and InEight both score 6.3/10 on our Industrial & Infrastructure Software criteria. The largest gap is in Scalability: 7/10 for Asta Powerproject and 9/10 for InEight.

Asta Powerproject has a free plan; InEight does not list one.

Asta Powerproject is the better fit for small business: we rate it 5/10 for them, against 2/10 for InEight.

Related Comparisons