b stack radar

Asta Powerproject vs Procore (2026): Pricing, Features & Verdict

Procore is our pick, scoring 6.8/10 against 6.3/10 for Asta Powerproject on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Scalability score (9/10 vs 7/10). Only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

Procore logo

Procore

6.8/10

Winner

Cloud construction management platform that gives owners, general contractors and specialty contractors project management, drawings, quality and safety, and financial tools.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
Procore logo
Procore
Scores
Overall Rating6.3/106.8/10
Scalability7/109/10
Analytics7/107/10
Support7/107/10
Security5/107/10
Cost4/103/10
Customization7/107/10
Ease of Use5/106/10
Integration7/108/10
Pricing
Free planYesNo
Cheapest paid planContact for pricingContact for pricing
Estimated cost for 10 usersFree
ProjectViewer
Contact for pricing
Features
Document ControlNot listed
Inspection ChecklistsNot listed
Safety and ComplianceNot listed
More features
App integrationsNot listed
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
SchedulingNot listed
ReportingNot listed

Asta Powerproject vs Procore cost by team size

Team sizeAsta PowerprojectProcore
1 userContact for pricingContact for pricing
5 usersFreeProjectViewerContact for pricing
10 usersFreeProjectViewerContact for pricing
25 usersFreeProjectViewerContact for pricing
50 usersFreeProjectViewerContact for pricing

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and Procore suit

Asta Powerproject fits small business better than Procore.

AudienceAsta PowerprojectProcore
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.3/10Reviewers say small contractors find it expensive and more complex than they need.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.8/10Unlimited users and volume-based multi-year contracts suit large builders with high construction volume.
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.10/10Procore is built for general contractors, owners and specialty contractors managing construction projects.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.Not rated
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.Not rated
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.Not rated
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.Not rated
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.Not rated
Real EstateNot rated7/10Owners and developers use it to oversee construction projects and their financials.
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.Not rated

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (Procore does not)
  • Higher Cost score (4/10 vs 3/10)
  • Better fit for small business (5/10 vs 3/10)

Procore logo
Why choose Procore

  • Higher Scalability score (9/10 vs 7/10)
  • Higher Security score (7/10 vs 5/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

Procore logo
Procore

Pros

  • Every contract includes unlimited users and storage, so subcontractors and field staff can be added at no extra cost.
  • Covers bidding, project management, quality and safety, and financials on one platform.
  • Inspection templates on mobile devices turn failed items into tracked observations and corrective actions.
  • Its marketplace connects to accounting tools such as QuickBooks, Sage and Viewpoint and to design tools such as AutoCAD and Revit.
  • Reporting is customizable, and one review counts more than 100 report options.

Cons

  • Pricing is quote-only and tied to construction volume, and third-party estimates start around 10,000 dollars a year.
  • Smaller contractors often say it is expensive and more sophisticated than they need.
  • Reviewers report a learning curve, so new users need training.
  • Some users report slow loading, bugs and cumbersome email notifications.
  • It is not a maintenance or asset management system, with no work orders for operating plants, sensor monitoring or spare parts inventory.

Not sold on either?

Frequently Asked Questions

Procore scores higher on our Industrial & Infrastructure Software criteria: 6.8/10 against 6.3/10 for Asta Powerproject. The largest gap is in Scalability: 7/10 for Asta Powerproject and 9/10 for Procore.

Asta Powerproject has a free plan; Procore does not list one.

Asta Powerproject is the better fit for small business: we rate it 5/10 for them, against 3/10 for Procore.

Related Comparisons