Asta Powerproject vs Trimble Tilos (2026): Pricing, Features & Verdict

Asta Powerproject is our pick, scoring 6.3/10 against 5.9/10 for Trimble Tilos on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Analytics score (7/10 vs 6/10). Only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

Winner

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

Trimble Tilos logo

Trimble Tilos

5.9/10

Time-location scheduling software from Trimble for linear infrastructure projects such as highways, railways, pipelines and tunnels, used by contractors and civil engineers.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
Trimble Tilos logo
Trimble Tilos
Scores
Overall Rating6.3/105.9/10
Scalability7/107/10
Analytics7/106/10
Support7/106/10
Security5/105/10
Cost4/103/10
Customization7/107/10
Ease of Use5/105/10
Integration7/107/10
Pricing
Free planYesNo
Cheapest paid planContact for pricingContact for pricing
Estimated cost for 10 usersFree
ProjectViewer
Contact for pricing
Features
App integrations
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline view
Task managementNot listed
Gantt charts
Scheduling
Reporting

Asta Powerproject vs Trimble Tilos cost by team size

Team sizeAsta PowerprojectTrimble Tilos
1 userContact for pricingContact for pricing
5 usersFreeProjectViewerContact for pricing
10 usersFreeProjectViewerContact for pricing
25 usersFreeProjectViewerContact for pricing
50 usersFreeProjectViewerContact for pricing

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and Trimble Tilos suit

Asta Powerproject fits small business better than Trimble Tilos.

AudienceAsta PowerprojectTrimble Tilos
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.3/10A reviewer notes the cost may be too high for smaller firms, and the specialist scope limits general use.
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.9/10Built for scheduling linear construction work such as highways, rail and pipelines.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.8/10Civil engineers use it to plan linear projects, and it links to civil design tools such as Novapoint and Quadri.
Energy CompaniesNot rated7/10Supports pipeline and transmission line projects.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.Not rated
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.Not rated
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.Not rated
GovernmentNot rated6/10Suits infrastructure owners that plan road and rail corridors.
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.Not rated
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.Not rated
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.Not rated

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (Trimble Tilos does not)
  • Higher Analytics score (7/10 vs 6/10)
  • Higher Support score (7/10 vs 6/10)
  • Better fit for small business (5/10 vs 3/10)

Trimble Tilos logo
Why choose Trimble Tilos

Our data shows no clear advantage over Asta Powerproject.

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

Trimble Tilos logo
Trimble Tilos

Pros

  • Time-distance diagrams show where and when each crew works along a corridor, which a Gantt chart alone cannot show.
  • Planners can overlay cost and resource histograms and mass haul diagrams on the schedule to check earthmoving plans.
  • Exchanges schedules with Microsoft Project, Primavera and Asta Powerproject, so it can sit alongside a main CPM schedule.
  • Connects closely with Trimble civil software such as Business Center, Quadri and Trimble Connect.
  • The few published user reviews are strongly positive, averaging about 4.7 out of 5 on Capterra.

Cons

  • Built only for linear projects, so it adds little for buildings or other projects that do not follow a corridor.
  • Reviewers mention a learning curve for people new to time-location planning.
  • No public pricing, and third-party estimates conflict, so budgets need a vendor quote.
  • Very few public user reviews to judge it by.
  • Not built for team collaboration or task management for wider project teams.

Not sold on either?

Frequently Asked Questions

Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 5.9/10 for Trimble Tilos. The largest gap is in Analytics: 7/10 for Asta Powerproject and 6/10 for Trimble Tilos.

Asta Powerproject has a free plan; Trimble Tilos does not list one.

Asta Powerproject is the better fit for small business: we rate it 5/10 for them, against 3/10 for Trimble Tilos.