Asta Powerproject vs BIMcollab (2026): Pricing, Features & Verdict
BIMcollab is our pick, scoring 6.8/10 against 6.3/10 for Asta Powerproject on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Cost score (7/10 vs 4/10). Only Asta Powerproject has a free plan.
Last updated: November 2026

Asta Powerproject
6.3/10
A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

BIMcollab
6.8/10
Cloud platform for BIM coordination, issue management, document control and model checking, used by construction, engineering and building-owner teams.
Feature-by-Feature Comparison
| Feature | ![]() | ![]() |
|---|---|---|
| Scores | ||
| Overall Rating | 6.3/10 | 6.8/10 |
| Scalability | 7/10 | 7/10 |
| Analytics | 7/10 | 6/10 |
| Support | 7/10 | 6/10 |
| Security | 5/10 | 6/10 |
| Cost | 4/10 | 7/10 |
| Customization | 7/10 | 7/10 |
| Ease of Use | 5/10 | 7/10 |
| Integration | 7/10 | 8/10 |
| Pricing | ||
| Free plan | Yes | No |
| Cheapest paid plan | Contact for pricing | €19/user/mo Basic |
| Estimated cost for 10 users | Free ProjectViewer | €190/mo Basic |
| Features | ||
| Digital Twin | Not listed | |
| Document Control | Not listed | |
| Engineering Design | Not listed | |
| More features | ||
| App integrations | Not listed | |
| Spreadsheet interface | Not listed | |
| Dashboards | Not listed | |
| Timeline view | Not listed | |
| Task management | Not listed | |
| Gantt charts | Not listed | |
| Scheduling | Not listed | |
| Reporting | Not listed | |
Asta Powerproject vs BIMcollab cost by team size
| Team size | Asta Powerproject | BIMcollab |
|---|---|---|
| 1 user | Contact for pricing | €19/moBasic |
| 5 users | FreeProjectViewer | €95/moBasic |
| 10 users | FreeProjectViewer | €190/moBasic |
| 25 users | FreeProjectViewer | €475/moBasic |
| 50 users | FreeProjectViewer | €950/moBasic |
The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.
Who Asta Powerproject and BIMcollab suit
Asta Powerproject fits field teams better; BIMcollab fits freelancers and remote teams better.
| Audience | Asta Powerproject | BIMcollab |
|---|---|---|
| Field Teams | 5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner. | 2/10The notes say it has no maintenance, work-order, or field-operations features. |
| Freelancers | 3/10Per-seat cost and training needs make it a poor fit for occasional individual users. | 5/10A single BIM coordinator can buy a per-user Basic seat with the IFC viewer and BCF plugins, but the platform is built for multi-party project coordination. |
| Remote Teams | 4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer. | 6/10The streaming WebViewer opens federated models in the browser and issue management is cloud-based, so coordinators do not have to be in one office. |
| Construction | 10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app. | 9/10It is built for clash detection and issue coordination between contractors and design teams. |
| Small Business | 5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training. | 6/10Published pricing starts at 19 euros per user per month, or 12.50 euros on annual billing, so a small project team can subscribe without a custom contract. |
| Engineering Firms | 8/10Critical path, resource and earned value tools suit engineering and infrastructure planners. | 8/10Engineering firms use the IDS model checks and BCF issue workflows with their authoring tools. |
| Enterprise | 7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall. | 7/10The Enterprise tier adds phase teams, custom roles and multi-project locations. |
| Finance Teams | 4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system. | Not rated |
| Maintenance Teams | Not rated | 2/10The same limit is explicit: there are no maintenance or work-order features, only BIM coordination and document control. |
| Mid-Market | 7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools. | Not rated |
| Operations Teams | 5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation. | Not rated |
| Real Estate | Not rated | 6/10Building owners such as universities and hospitals use Twin to manage documents and assets. |
| Startups | 2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company. | Not rated |
Which One Should You Choose?
Why choose Asta Powerproject

- Has a free plan (BIMcollab does not)
- Higher Analytics score (7/10 vs 6/10)
- Higher Support score (7/10 vs 6/10)
- Better fit for field teams (5/10 vs 2/10)
Why choose BIMcollab

- Higher Cost score (7/10 vs 4/10)
- Higher Ease of Use score (7/10 vs 5/10)
- Better fit for freelancers (5/10 vs 3/10)
- Better fit for remote teams (6/10 vs 4/10)
Pros & Cons
Asta Powerproject

Pros
- Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
- Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
- The BIM module links programmes to 3D models for 4D planning.
- The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
- Concurrent licensing lowers the per-user cost for planning teams that share seats.
Cons
- Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
- The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
- Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
- Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
- Exporting to Microsoft Project can lose hammock tasks and custom calendars.
BIMcollab

Pros
- Clear published per-user prices from 19 euros a month, with about a 35 percent discount on annual billing.
- Uses open standards (IFC, BCF, IDS), so mixed Revit, Archicad and other teams can coordinate in one place.
- Its streaming WebViewer opens large federated models in the browser.
- Reviewers on G2 and Capterra praise how easy clash identification is.
Cons
- Reviewers report slow file exports.
- Issue lists can get out of control on large projects unless the team enforces strict issue-creation rules.
- Zoom model checking costs extra on top of the platform tiers.
- It has no maintenance, work-order or field-operations features.
Not sold on either?
Frequently Asked Questions
BIMcollab scores higher on our Industrial & Infrastructure Software criteria: 6.8/10 against 6.3/10 for Asta Powerproject. The largest gap is in Cost: 4/10 for Asta Powerproject and 7/10 for BIMcollab.
Asta Powerproject has a free plan; BIMcollab does not list one.
Asta Powerproject is the better fit for field teams: we rate it 5/10 for them, against 2/10 for BIMcollab.

