Asta Powerproject vs Autodesk Construction Cloud (2026): Pricing, Features & Verdict
Asta Powerproject is our pick, scoring 6.3/10 against 6.2/10 for Autodesk Construction Cloud on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Analytics score (7/10 vs 6/10). For 10 users, Asta Powerproject is free, against $1,000/mo for Autodesk Construction Cloud; only Asta Powerproject has a free plan.
Last updated: November 2026

Asta Powerproject
6.3/10
A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

Autodesk Construction Cloud
6.2/10
Autodesk's construction management cloud, renamed Autodesk Forma in 2026. It covers document control, BIM coordination, preconstruction, field quality and safety, and closeout for contractors and design teams.
Feature-by-Feature Comparison
| Feature | ![]() | ![]() |
|---|---|---|
| Scores | ||
| Overall Rating | 6.3/10 | 6.2/10 |
| Scalability | 7/10 | 9/10 |
| Analytics | 7/10 | 6/10 |
| Support | 7/10 | 6/10 |
| Security | 5/10 | 7/10 |
| Cost | 4/10 | 3/10 |
| Customization | 7/10 | 6/10 |
| Ease of Use | 5/10 | 5/10 |
| Integration | 7/10 | 8/10 |
| Pricing | ||
| Free plan | Yes | No |
| Cheapest paid plan | Contact for pricing | $100/user/mo Forma Build Essentials |
| Estimated cost for 10 users | Free ProjectViewer | $1,000/mo Forma Build Essentials |
| Features | ||
| Digital Twin | Not listed | |
| Document Control | Not listed | |
| Engineering Design | Not listed | |
| Inspection Checklists | Not listed | |
| Offline Field App | Not listed | |
| Safety and Compliance | Not listed | |
| More features | ||
| App integrations | Not listed | |
| Spreadsheet interface | Not listed | |
| Dashboards | Not listed | |
| Timeline view | Not listed | |
| Task management | Not listed | |
| Gantt charts | Not listed | |
| Scheduling | Not listed | |
| Reporting | Not listed | |
Asta Powerproject vs Autodesk Construction Cloud cost by team size
Asta Powerproject costs less from 5 users.
| Team size | Asta Powerproject | Autodesk Construction Cloud |
|---|---|---|
| 1 user | Contact for pricing | $100/moForma Build Essentials |
| 5 users | FreeProjectViewer | $500/moForma Build Essentials |
| 10 users | FreeProjectViewer | $1,000/moForma Build Essentials |
| 25 users | FreeProjectViewer | $2,500/moForma Build Essentials |
| 50 users | FreeProjectViewer | $5,000/moForma Build Essentials |
The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.
Who Asta Powerproject and Autodesk Construction Cloud suit
Autodesk Construction Cloud fits field teams and finance teams better than Asta Powerproject.
| Audience | Asta Powerproject | Autodesk Construction Cloud |
|---|---|---|
| Field Teams | 5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner. | 7/10The mobile app covers issues, forms, photos and offline project data, though some reviewers say the field tools feel office-centric. |
| Finance Teams | 4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system. | 6/10The platform includes takeoff and estimating, bid management and cost management alongside document control and field execution. |
| Construction | 10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app. | 9/10The platform is built for contractors and covers bidding, field work and closeout. |
| Enterprise | 7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall. | 8/10Large firms get quoted unlimited-user agreements and bundles across project phases. |
| Freelancers | 3/10Per-seat cost and training needs make it a poor fit for occasional individual users. | 2/10It is a multi-module construction cloud sold per user at about $100 to $175 a month for project teams, not a single-person tool. |
| Small Business | 5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training. | 4/10Reviewers cite cost and setup effort as barriers for small firms, though the Essentials tier aims to lower them. |
| Engineering Firms | 8/10Critical path, resource and earned value tools suit engineering and infrastructure planners. | 8/10Design collaboration and model coordination work directly with Revit and Navisworks. |
| Mid-Market | 7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools. | 7/10Forma Build Essentials is about $100 per user per month and Forma Build about $175, sitting between a lower-cost entry for smaller contractors and quote-only unlimited agreements. |
| Startups | 2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company. | 2/10Per-user prices start around $100 a month, bundle pricing is quote-only, and reviewers say implementation often needs a consultant. |
| Operations Teams | 5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation. | Not rated |
| Remote Teams | 4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer. | Not rated |
Which One Should You Choose?
Why choose Asta Powerproject

- Has a free plan (Autodesk Construction Cloud does not)
- Lower estimated cost for 10 users: Free vs $1,000/mo
- Higher Analytics score (7/10 vs 6/10)
- Higher Support score (7/10 vs 6/10)
Why choose Autodesk Construction Cloud

- Higher Scalability score (9/10 vs 7/10)
- Higher Security score (7/10 vs 5/10)
- Better fit for field teams (7/10 vs 5/10)
- Better fit for finance teams (6/10 vs 4/10)
Pros & Cons
Asta Powerproject

Pros
- Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
- Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
- The BIM module links programmes to 3D models for 4D planning.
- The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
- Concurrent licensing lowers the per-user cost for planning teams that share seats.
Cons
- Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
- The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
- Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
- Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
- Exporting to Microsoft Project can lose hammock tasks and custom calendars.
Autodesk Construction Cloud

Pros
- The common data environment and model coordination link natively with Revit, AutoCAD and Navisworks, which makes the platform strong for BIM-heavy projects.
- It covers preconstruction, field execution and closeout from one vendor, sold as products or bundles.
- The mobile app syncs project data for offline use and supports quality and safety inspection forms with photos and signatures.
- The new Build Essentials tier at $100 per user per month gives smaller contractor teams a lower-cost way in.
- Autodesk offers a 30-day money-back guarantee.
Cons
- Bundle and unlimited-user pricing is quote-only, and reviewers describe the total cost as high for smaller firms.
- Reviewers say implementation and training take more effort than expected, and a consultant is often needed.
- Modules came from acquisitions and can feel like separate products.
- The 2026 rename to Forma changed product names, which can confuse existing users and documentation.
- It has no maintenance work orders, asset registry or condition monitoring for operating facilities.
Not sold on either?
Frequently Asked Questions
Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 6.2/10 for Autodesk Construction Cloud. The largest gap is in Scalability: 7/10 for Asta Powerproject and 9/10 for Autodesk Construction Cloud.
Asta Powerproject costs less for 10 users: free on its ProjectViewer plan, against about $1,000/mo on its Forma Build Essentials plan for Autodesk Construction Cloud, billed monthly.
Asta Powerproject has a free plan; Autodesk Construction Cloud does not list one.
Autodesk Construction Cloud is the better fit for field teams: we rate it 7/10 for them, against 5/10 for Asta Powerproject.

