b stack radar

Asta Powerproject vs Tulip (2026): Pricing, Features & Verdict

Tulip is our pick, scoring 7.3/10 against 6.3/10 for Asta Powerproject on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Ease of Use score (8/10 vs 5/10). For 10 users, Asta Powerproject is free, against $1,000/mo for Tulip; only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

Tulip logo

Tulip

7.3/10

Winner

Tulip is a no-code, app-based manufacturing execution and connected worker platform that lets manufacturers build shop-floor apps for work instructions, quality checks, and machine monitoring.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
Tulip logo
Tulip
Scores
Overall Rating6.3/107.3/10
Scalability7/107/10
Analytics7/106/10
Support7/107/10
Security5/107/10
Cost4/105/10
Customization7/109/10
Ease of Use5/108/10
Integration7/108/10
Pricing
Free planYesNo
Cheapest paid planContact for pricing$100/user/mo
Essentials
Estimated cost for 10 usersFree
ProjectViewer
$1,000/mo
Essentials
Features
Condition MonitoringNot listed
Inspection AutomationNot listed
Inspection ChecklistsNot listed
SCADA and IoT IntegrationNot listed
More features
App integrationsNot listed
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
SchedulingNot listed
ReportingNot listed

Asta Powerproject vs Tulip cost by team size

Asta Powerproject costs less from 10 users.

Team sizeAsta PowerprojectTulip
1 userContact for pricingContact for pricing
5 usersFreeProjectViewerContact for pricing
10 usersFreeProjectViewer$1,000/moEssentials
25 usersFreeProjectViewer$2,500/moEssentials
50 usersFreeProjectViewer$5,000/moEssentials

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and Tulip suit

Tulip fits operations teams better than Asta Powerproject.

AudienceAsta PowerprojectTulip
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.8/10Operations engineers build and run frontline process apps without writing code.
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.4/10The 10-interface minimum puts entry spend at about $12,000 a year.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.7/10The Enterprise and Regulated Industries plans add workspaces, approval workflows, GxP features, and GovCloud options.
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.Not rated
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.Not rated
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.Not rated
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.Not rated
ManufacturingNot rated10/10Tulip is built as an MES and connected worker platform for shop floors.
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.Not rated
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.Not rated

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (Tulip does not)
  • Lower estimated cost for 10 users: Free vs $1,000/mo
  • Higher Analytics score (7/10 vs 6/10)

Tulip logo
Why choose Tulip

  • Higher Ease of Use score (8/10 vs 5/10)
  • Higher Security score (7/10 vs 5/10)
  • Better fit for operations teams (8/10 vs 5/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

Tulip logo
Tulip

Pros

  • The no-code drag-and-drop editor lets process engineers build shop-floor apps without developers.
  • Billing per interface rather than per user can be cheaper for shop floors with many workers sharing stations.
  • Connectors cover OPC UA, MQTT, HTTP, SQL, and USB devices such as scales and barcode scanners.
  • The Regulated Industries plan includes 21 CFR Part 11 e-signatures and a validation pack for GxP manufacturers.
  • Reviewers report better traceability and real-time visibility after replacing paper processes.

Cons

  • The 10-interface minimum and paid add-ons for machine monitoring, vision, and premium support raise first-year cost.
  • Reviewers find analytics and table joins limited compared with specialist tools.
  • It is cloud SaaS, with no classic full on-premises deployment.
  • Custom widgets support only a limited set of JavaScript libraries.
  • Enterprise and regulated plan prices are not published.

Not sold on either?

Air Inspection Automation (AiA) logo

Air Inspection Automation (AiA)Our product

Plans DJI drone inspection missions for power line towers from LiDAR scans: it finds the towers, places photo stops, checks clearance, and splits the route into battery flights.

Made by the team behind b stack radar. Shown here because it fits this topic. It is not part of our rankings. How we rank tools

Frequently Asked Questions

Tulip scores higher on our Industrial & Infrastructure Software criteria: 7.3/10 against 6.3/10 for Asta Powerproject. The largest gap is in Ease of Use: 5/10 for Asta Powerproject and 8/10 for Tulip.

Asta Powerproject costs less for 10 users: free on its ProjectViewer plan, against about $1,000/mo on its Essentials plan for Tulip, billed monthly.

Asta Powerproject has a free plan; Tulip does not list one.

Tulip is the better fit for operations teams: we rate it 8/10 for them, against 5/10 for Asta Powerproject.

Related Comparisons