b stack radar

Asta Powerproject vs Geotab (2026): Pricing, Features & Verdict

Geotab is our pick, scoring 7.5/10 against 6.3/10 for Asta Powerproject on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Security score (9/10 vs 5/10). Only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

G

Geotab

7.5/10

Winner

Geotab is a telematics platform that combines GO vehicle tracking devices and MyGeotab software to manage fleet tracking, maintenance, safety, compliance and fuel use for businesses and government fleets.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
G
Geotab
Scores
Overall Rating6.3/107.5/10
Scalability7/109/10
Analytics7/108/10
Support7/106/10
Security5/109/10
Cost4/105/10
Customization7/108/10
Ease of Use5/106/10
Integration7/109/10
Pricing
Free planYesNo
Cheapest paid planContact for pricingContact for pricing
Estimated cost for 10 usersFree
ProjectViewer
Contact for pricing
Features
Asset RegistryNot listed
Condition MonitoringNot listed
GIS and MappingNot listed
Inspection ChecklistsNot listed
Predictive MaintenanceNot listed
Preventive MaintenanceNot listed
Safety and ComplianceNot listed
Work OrdersNot listed
More features
App integrationsNot listed
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
SchedulingNot listed
ReportingNot listed

Asta Powerproject vs Geotab cost by team size

Team sizeAsta PowerprojectGeotab
1 userContact for pricingContact for pricing
5 usersFreeProjectViewerContact for pricing
10 usersFreeProjectViewerContact for pricing
25 usersFreeProjectViewerContact for pricing
50 usersFreeProjectViewerContact for pricing

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and Geotab suit

Asta Powerproject fits construction better; Geotab fits field teams better.

AudienceAsta PowerprojectGeotab
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.6/10Asset trackers and engine-hour maintenance cover vehicles and equipment, though Geotab is fleet-centric.
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.7/10The Geotab Drive app handles inspections and compliance for drivers in the field.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.8/10Geotab serves Fortune 500 fleets, offers open APIs and BI connectors, and runs in more than 130 countries.
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.6/10Tech.co suits it to small fleets, but reviews note above-average cost and a learning curve.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.Not rated
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.Not rated
GovernmentNot rated9/10Geotab holds FedRAMP authorization and FIPS 140-3 validation, and it serves US federal fleets.
LogisticsNot rated9/10Geotab includes HOS/ELD, IFTA, routing and fuel tools built for trucking and delivery fleets.
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.Not rated
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.Not rated
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.Not rated
UtilitiesNot rated7/10Utilities run large service fleets that need tracking, maintenance and safety management, which Geotab covers.

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (Geotab does not)
  • Higher Support score (7/10 vs 6/10)
  • Better fit for construction (10/10 vs 6/10)

G
Why choose Geotab

  • Higher Security score (9/10 vs 5/10)
  • Higher Scalability score (9/10 vs 7/10)
  • Better fit for field teams (7/10 vs 5/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

G
Geotab

Pros

  • Open platform: a free SDK and APIs, a Marketplace with 400+ listed integrations, IOX sensor expansion, and a BI Data Connector
  • Strong security credentials, including FedRAMP, FIPS 140-3, ISO 27001 and SOC 2, suit government and regulated fleets
  • Hardware is bundled in the subscription, and moving from GO Core to GO Plan needs no device swap
  • FMCSA-certified ELD covers HOS, DVIR and IFTA, with over 100 HOS rulesets
  • Scales from small fleets to millions of connected vehicles in more than 130 countries

Cons

  • No public pricing: quotes come from resellers, and some resellers require multi-year contracts
  • Support quality and responsiveness vary by reseller
  • Reviewers report a steep learning curve for exception rules and custom reports
  • Users report that the mobile app is slow or crashes, and TechRadar notes a low iOS app rating
  • No in-app traffic overlays, and fuel management and predictive maintenance require the higher plan

Not sold on either?

Frequently Asked Questions

Geotab scores higher on our Industrial & Infrastructure Software criteria: 7.5/10 against 6.3/10 for Asta Powerproject. The largest gap is in Security: 5/10 for Asta Powerproject and 9/10 for Geotab.

Asta Powerproject has a free plan; Geotab does not list one.

Asta Powerproject is the better fit for construction: we rate it 10/10 for them, against 6/10 for Geotab.

Related Comparisons