b stack radar

Asta Powerproject vs CARTO (2026): Pricing, Features & Verdict

CARTO is our pick, scoring 7.7/10 against 6.3/10 for Asta Powerproject on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Scalability score (9/10 vs 7/10). Only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

CARTO logo

CARTO

7.7/10

Winner

CARTO is a cloud-native location intelligence platform that runs spatial analysis, mapping and geospatial apps directly in cloud data warehouses for enterprise data teams.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
CARTO logo
CARTO
Scores
Overall Rating6.3/107.7/10
Scalability7/109/10
Analytics7/109/10
Support7/107/10
Security5/107/10
Cost4/104/10
Customization7/108/10
Ease of Use5/107/10
Integration7/109/10
Pricing
Free planYesNo
Cheapest paid planContact for pricingContact for pricing
Estimated cost for 10 usersFree
ProjectViewer
Contact for pricing
Features
GIS and MappingNot listed
More features
App integrationsNot listed
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
SchedulingNot listed
ReportingNot listed

Asta Powerproject vs CARTO cost by team size

Team sizeAsta PowerprojectCARTO
1 userContact for pricingContact for pricing
5 usersFreeProjectViewerContact for pricing
10 usersFreeProjectViewerContact for pricing
25 usersFreeProjectViewerContact for pricing
50 usersFreeProjectViewerContact for pricing

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and CARTO suit

Asta Powerproject fits field teams and small business better; CARTO fits enterprise better.

AudienceAsta PowerprojectCARTO
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.2/10The notes say CARTO is not a field-work system and that reviewers mark down mobile and web GIS because there is no field tooling.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.9/10Committed tiers, self-hosting, SSO, audit logs and Elite support are aimed at large organizations.
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.3/10There are no published prices, the minimum contract is 12 months, and reviewers say the cost may be high for smaller teams.
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.2/10Analysis runs in cloud warehouses such as BigQuery and Snowflake, and advanced work still requires SQL on a 12-month contract.
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.3/10Prices are quote-based and even Pay As You Go needs a 12-month contract, with analysis tied to an existing cloud warehouse.
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.Not rated
DevelopersNot rated8/10Offers APIs, deck.gl support, coding agents and an MCP server for building geospatial apps.
E-commerceNot rated4/10Retail is named as a target sector for warehouse-based location analytics, and the product does not run a storefront or checkout.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.Not rated
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
GovernmentNot rated8/10The overview says CARTO suits analytics and data teams in government, alongside enterprises, telecoms, utilities and retail.
IT TeamsNot rated6/10It queries data in the customer's own warehouse, self-hosting is available on committed tiers, and it is sold through the Google Cloud, AWS, Azure and Snowflake marketplaces.
Maintenance TeamsNot rated2/10The notes say it is not an asset-maintenance system and that there is no maintenance tooling.
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.Not rated
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.Not rated
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated
UtilitiesNot rated6/10Suited to spatial analysis of network data held in a warehouse, but it has no asset maintenance or field tooling.

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (CARTO does not)
  • Better fit for field teams (5/10 vs 2/10)
  • Better fit for small business (5/10 vs 3/10)

CARTO logo
Why choose CARTO

  • Higher Scalability score (9/10 vs 7/10)
  • Higher Analytics score (9/10 vs 7/10)
  • Better fit for enterprise (9/10 vs 7/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

CARTO logo
CARTO

Pros

  • Runs analysis directly inside BigQuery, Snowflake, Databricks, Redshift and Oracle without copying data, which reviewers say saves time and storage.
  • Builder renders very large datasets, and reviewers rate it highly for mapping and visualization.
  • The Data Observatory gives access to more than 12,000 datasets for enrichment.
  • Can be bought through the Google Cloud, AWS, Azure and Snowflake marketplaces, and self-hosting is available on committed tiers.
  • SoftwareReviews users report strong loyalty, with 98 percent planning to renew.

Cons

  • Advanced analysis still requires SQL, so non-technical users face a learning curve.
  • No public prices, and even Pay As You Go needs a 12-month contract.
  • Warehouse query costs can be hard to predict at high usage.
  • Reviewers give lower marks for mobile and web GIS, and there is no field or maintenance tooling.
  • The trial lasts 30 days, cannot be extended and cannot be used in production.

Not sold on either?

Frequently Asked Questions

CARTO scores higher on our Industrial & Infrastructure Software criteria: 7.7/10 against 6.3/10 for Asta Powerproject. The largest gap is in Analytics: 7/10 for Asta Powerproject and 9/10 for CARTO.

Asta Powerproject has a free plan; CARTO does not list one.

Asta Powerproject is the better fit for field teams: we rate it 5/10 for them, against 2/10 for CARTO.

Related Comparisons