b stack radar

Asta Powerproject vs Redzone (2026): Pricing, Features & Verdict

Redzone is our pick, scoring 7.2/10 against 6.3/10 for Asta Powerproject on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Ease of Use score (8/10 vs 5/10). Only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

Redzone logo

Redzone

7.2/10

Winner

Connected workforce platform from QAD that gives manufacturing frontline teams real-time OEE tracking, a CMMS for maintenance, quality compliance, training, and AI guidance.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
Redzone logo
Redzone
Scores
Overall Rating6.3/107.2/10
Scalability7/108/10
Analytics7/108/10
Support7/109/10
Security5/105/10
Cost4/104/10
Customization7/106/10
Ease of Use5/108/10
Integration7/107/10
Pricing
Free planYesNo
Cheapest paid planContact for pricingContact for pricing
Estimated cost for 10 usersFree
ProjectViewer
Contact for pricing
Features
Asset RegistryNot listed
Inspection ChecklistsNot listed
Predictive MaintenanceNot listed
Preventive MaintenanceNot listed
Spare Parts InventoryNot listed
Work OrdersNot listed
More features
App integrationsNot listed
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
SchedulingNot listed
ReportingNot listed

Asta Powerproject vs Redzone cost by team size

Team sizeAsta PowerprojectRedzone
1 userContact for pricingContact for pricing
5 usersFreeProjectViewerContact for pricing
10 usersFreeProjectViewerContact for pricing
25 usersFreeProjectViewerContact for pricing
50 usersFreeProjectViewerContact for pricing

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and Redzone suit

Redzone fits operations teams better than Asta Powerproject.

AudienceAsta PowerprojectRedzone
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.9/10Real-time productivity tracking and crew scheduling target plant operations.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.8/10It is used by large manufacturers such as Nestle and Tyson and is backed by QAD.
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.7/10Customers listed by the vendor include mid-sized plants such as Sauder Woodworking and Taffy Town.
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.Not rated
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.Not rated
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.Not rated
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.Not rated
Maintenance TeamsNot rated7/10The Reliability module provides a TPM-based CMMS with work orders, PM, and spare parts.
ManufacturingNot rated10/10The whole product is built around plant lines, shifts, and OEE in factories.
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.Not rated
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.Not rated

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (Redzone does not)
  • Higher Customization score (7/10 vs 6/10)

Redzone logo
Why choose Redzone

  • Higher Ease of Use score (8/10 vs 5/10)
  • Higher Support score (9/10 vs 7/10)
  • Better fit for operations teams (9/10 vs 5/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

Redzone logo
Redzone

Pros

  • Highly rated by users, with about 4.9 out of 5 on Capterra and 4.8 on G2 across hundreds of reviews
  • Reviewers often praise the coaching and onboarding support
  • Combines OEE tracking, quality compliance, training, and a CMMS in one frontline platform
  • Reliability keeps maintenance history, failure logs, and linked spare parts for each asset, and its dashboards report MTBF and MTTR
  • Connects to existing ERPs such as SAP, Oracle, Infor M3, and QAD without replacing them

Cons

  • No public pricing
  • Some reviewers report software glitches and sensor data delays
  • One reviewer found some of the technical aspects of on-the-floor data collection hard to learn
  • The vendor's pages do not mention meter-based PM triggers, hardware condition monitoring, or offline use
  • It is focused on manufacturing and is not suited to utilities or infrastructure assets

Not sold on either?

Frequently Asked Questions

Redzone scores higher on our Industrial & Infrastructure Software criteria: 7.2/10 against 6.3/10 for Asta Powerproject. The largest gap is in Ease of Use: 5/10 for Asta Powerproject and 8/10 for Redzone.

Asta Powerproject has a free plan; Redzone does not list one.

Redzone is the better fit for operations teams: we rate it 9/10 for them, against 5/10 for Asta Powerproject.

Related Comparisons