b stack radar

Asta Powerproject vs RedTeam Flex (2026): Pricing, Features & Verdict

Asta Powerproject is our pick, scoring 6.3/10 against 6.2/10 for RedTeam Flex on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Scalability score (7/10 vs 6/10). Only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

Winner

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

RedTeam Flex logo

RedTeam Flex

6.2/10

Cloud construction management and project financial software for commercial general contractors and construction managers, covering preconstruction through closeout and billing.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
RedTeam Flex logo
RedTeam Flex
Scores
Overall Rating6.3/106.2/10
Scalability7/106/10
Analytics7/106/10
Support7/108/10
Security5/104/10
Cost4/105/10
Customization7/107/10
Ease of Use5/106/10
Integration7/106/10
Pricing
Free planYesNo
Cheapest paid planContact for pricingContact for pricing
Estimated cost for 10 usersFree
ProjectViewer
Contact for pricing
Features
Document ControlNot listed
More features
App integrationsNot listed
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
SchedulingNot listed
ReportingNot listed

Asta Powerproject vs RedTeam Flex cost by team size

Team sizeAsta PowerprojectRedTeam Flex
1 userContact for pricingContact for pricing
5 usersFreeProjectViewerContact for pricing
10 usersFreeProjectViewerContact for pricing
25 usersFreeProjectViewerContact for pricing
50 usersFreeProjectViewerContact for pricing

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and RedTeam Flex suit

AudienceAsta PowerprojectRedTeam Flex
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.9/10Built specifically for commercial general contractors and construction managers, from preconstruction through billing.
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.4/10Reviewers say setup and advanced configuration feel heavy for smaller teams.
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.7/10The vendor's marketing targets mid-size to large construction firms, and the starting price is around 10,000 USD per year.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.Not rated
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.Not rated
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.Not rated
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.Not rated
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.Not rated
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.Not rated

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (RedTeam Flex does not)
  • Higher Scalability score (7/10 vs 6/10)
  • Higher Analytics score (7/10 vs 6/10)

RedTeam Flex logo
Why choose RedTeam Flex

  • Higher Support score (8/10 vs 7/10)
  • Higher Cost score (5/10 vs 4/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

RedTeam Flex logo
RedTeam Flex

Pros

  • Project management and job financials such as WIP reports, AIA billing, and lien waivers sit in one system, so contractors need fewer separate tools.
  • Reviewers on RFP.wiki rate support and training highly, and every client gets a dedicated implementation specialist and success manager.
  • Drawing management includes OCR sheet naming, redlines, and revision overlays at no extra cost.
  • Connects to contractor accounting systems including QuickBooks Online, Sage 100 Contractor, Sage 300 CRE, and Sage Intacct.
  • Preconstruction tools support hard-bid, negotiated, and CMAR workflows.

Cons

  • Users report lag and slow responses, especially at busy times.
  • Setup and permissions take a lot of admin effort, and smaller teams may find configuration heavy.
  • The mobile app trails the desktop version, and one superintendent reported it sometimes does not fully load in the field.
  • Custom reporting and export options are limited.
  • There is no public price list, uptime SLA, or security certification.

Not sold on either?

Frequently Asked Questions

Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 6.2/10 for RedTeam Flex. The largest gap is in Analytics: 7/10 for Asta Powerproject and 6/10 for RedTeam Flex.

Asta Powerproject has a free plan; RedTeam Flex does not list one.

Related Comparisons