Fulcrum vs Power Factors (2026): Pricing, Features & Verdict
Fulcrum and Power Factors both score 6.8/10 on our Industrial & Infrastructure Software criteria. Neither Fulcrum nor Power Factors lists a free plan.
Last updated: November 2026

Fulcrum
6.8/10
Fulcrum is a no-code mobile app for location-based field inspections and data collection, used by utilities, infrastructure and field teams.

Power Factors
6.8/10
Unity is Power Factors' software suite for monitoring, controlling, and maintaining utility-scale solar, wind, and battery fleets.
Feature-by-Feature Comparison
| Feature | ![]() | ![]() |
|---|---|---|
| Scores | ||
| Overall Rating | 6.8/10 | 6.8/10 |
| Scalability | 7/10 | 9/10 |
| Analytics | 5/10 | 8/10 |
| Support | 6/10 | 6/10 |
| Security | 8/10 | 8/10 |
| Cost | 5/10 | 3/10 |
| Customization | 8/10 | 7/10 |
| Ease of Use | 8/10 | 5/10 |
| Integration | 7/10 | 8/10 |
| Pricing | ||
| Free plan | No | No |
| Cheapest paid plan | $43/user/mo Professional | Contact for pricing |
| Estimated cost for 10 users | $430/mo Professional | Contact for pricing |
| Features | ||
| Inspection Checklists | ||
| Offline Field App | ||
| Asset Registry | Not listed | |
| Condition Monitoring | Not listed | |
| Digital Twin | Not listed | |
| Drone Inspection | Not listed | |
| Engineering Design | Not listed | |
| Engineering Simulation | Not listed | |
| GIS and Mapping | Not listed | |
| Inspection Automation | Not listed | |
| LiDAR Processing | Not listed | |
| Power Line Inspection | Not listed | |
| Predictive Maintenance | Not listed | |
| Preventive Maintenance | Not listed | |
| Safety and Compliance | Not listed | |
| SCADA and IoT Integration | Not listed | |
| Spare Parts Inventory | Not listed | |
| Work Orders | Not listed | |
Fulcrum vs Power Factors cost by team size
| Team size | Fulcrum | Power Factors |
|---|---|---|
| 1 user | Contact for pricing | Contact for pricing |
| 5 users | $215/moProfessional | Contact for pricing |
| 10 users | $430/moProfessional | Contact for pricing |
| 25 users | $1,075/moProfessional | Contact for pricing |
| 50 users | $2,150/moProfessional | Contact for pricing |
The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.
Who Fulcrum and Power Factors suit
Fulcrum fits small business better than Power Factors.
| Audience | Fulcrum | Power Factors |
|---|---|---|
| Small Business | 4/10The five-user minimum and annual contract raise the entry cost for very small teams. | 2/10Reviewers say rooftop installers, single sites, and small teams would pay for far more system than they need. |
| Field Teams | 9/10It is built around offline mobile forms with photo, GPS and signature capture for crews in the field. | 8/10Technicians get a mobile app with asset history, inspections, photos, job hazard analysis, and offline work-order updates at remote plants. |
| Utilities | 8/10ArcGIS and Maximo integrations support utility asset inspections. | 8/10Independent power producers and utilities use it for utility-scale fleets and grid-code plant control, though it is not a transmission and distribution network tool. |
| Energy Companies | Not rated | 10/10Unity is built only for renewable generators, covering solar, wind, battery storage, and hybrid plants from SCADA through commercial settlement. |
| Engineering Firms | 7/10Geospatial inspection data collection fits survey and engineering field work. | Not rated |
| Enterprise | Not rated | 9/10The vendor reports 600-plus customers and more than 310 gigawatts under management, and the product is sold as a multi-module enterprise project. |
| Government | 7/10The vendor publishes county customer stories and offers ArcGIS-linked workflows. | Not rated |
| Maintenance Teams | Not rated | 8/10Field service covers preventive, corrective, and emergency work orders, checklists, parts, and condition-based triggers from performance data. |
| Mid-Market | Not rated | 3/10Independent reviews say the suite is impractical below utility scale because pricing is quote-only and SCADA is a commissioned engineering project. |
| Operations Teams | Not rated | 9/10Remote operations centers get fleet-to-device SCADA, loss categorization, and dispatch tied to asset criticality. |
Which One Should You Choose?
Why choose Fulcrum

- Higher Ease of Use score (8/10 vs 5/10)
- Higher Cost score (5/10 vs 3/10)
- Better fit for small business (4/10 vs 2/10)
Why choose Power Factors

- Higher Analytics score (8/10 vs 5/10)
- Higher Scalability score (9/10 vs 7/10)
Pros & Cons
Fulcrum

Pros
- Field crews can capture photos, GPS, barcodes and signatures offline, and records sync automatically when they reconnect.
- The no-code builder supports conditional logic and repeatable sections, so admins can build inspection forms without developers.
- Two-way ArcGIS Online and Enterprise integration suits GIS-centric utilities and governments.
- Strong security credentials include SOC 2 Type II, ISO 27001 and a choice of US, Canadian, EU or Australian hosting.
- Reviewers on GetApp and Capterra rate it about 4.7 out of 5.
Cons
- The five-user minimum and required annual contract raise the entry cost, and reviewers have complained about price increases.
- It has no built-in work orders, spare parts tracking or sensor monitoring, so a separate CMMS is needed.
- Reviewers say reporting and filtering are limited without outside BI tools.
- Some users report slow photo loading and sync delays with large forms.
- One reviewer reported waiting 7 to 10 business days for a support response, and phone support is only on Elite and above.
Power Factors

Pros
- One vendor covers local and central SCADA, plant control, battery energy management, performance analytics, field work orders, and invoicing for solar, wind, and storage.
- SCADA accepts multi-vendor plants over IEC 61850, IEC 60870-5-104, DNP3, Modbus, and OPC-UA, so mixed OEM fleets do not need a separate monitor per brand.
- Asset performance management ranks losses such as soiling, degradation, and curtailment and can open field work from those events, which Origis Energy uses to chase plant performance.
- Field technicians can complete inspections, photos, and work orders offline, then sync when service returns, which matters at remote renewable sites.
- The vendor publishes ISO 27001, ISO 27017, and ISO 27019 certificates and says SCADA is built toward NERC CIP, NIS2, and IEC 62443.
Cons
- No public prices, plan comparison, or free trial, so cost is unknown until a sales quote.
- SCADA and plant controllers are designed, factory-tested, and commissioned per site, so rollout is an engineering project rather than a software install.
- Independent 2026 reviews describe a high learning curve and say the suite is a poor fit for a single small plant or a team that only needs work orders.
- Public user reviews are almost absent: a Gartner Peer Insights page for UNITY had no reviews, and Capterra showed no reviewer ratings for the PowerFactors listing.
- The vendor's own Unity page says the REMI intelligence layer is still coming to monitoring and control, so agent-style automation is not yet across the whole suite.
Not sold on either?
Frequently Asked Questions
Fulcrum and Power Factors both score 6.8/10 on our Industrial & Infrastructure Software criteria. The largest gap is in Analytics: 5/10 for Fulcrum and 8/10 for Power Factors.
No, neither Fulcrum nor Power Factors lists a free plan.
Fulcrum is the better fit for small business: we rate it 4/10 for them, against 2/10 for Power Factors.

