CIVA vs Power Factors (2026): Pricing, Features & Verdict
Power Factors is our pick, scoring 6.8/10 against 6/10 for CIVA on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Integration score (8/10 vs 5/10). Neither CIVA nor Power Factors lists a free plan.
Last updated: November 2026

CIVA
6/10
CIVA is modular desktop software for simulating and analysing non-destructive testing inspections, including ultrasonic, eddy current, radiography, guided wave and thermography methods, for industrial NDT teams.

Power Factors
6.8/10
Unity is Power Factors' software suite for monitoring, controlling, and maintaining utility-scale solar, wind, and battery fleets.
Feature-by-Feature Comparison
| Feature | ![]() | ![]() |
|---|---|---|
| Scores | ||
| Overall Rating | 6/10 | 6.8/10 |
| Analytics | 8/10 | 8/10 |
| Cost | 3/10 | 3/10 |
| Customization | 7/10 | 7/10 |
| Ease of Use | 5/10 | 5/10 |
| Integration | 5/10 | 8/10 |
| Scalability | 6/10 | 9/10 |
| Security | 5/10 | 8/10 |
| Support | 7/10 | 6/10 |
| Pricing | ||
| Free plan | No | No |
| Cheapest paid plan | Contact for pricing | Contact for pricing |
| Estimated cost for 10 users | Contact for pricing | Contact for pricing |
| Features | ||
| Engineering Simulation | ||
| Asset Registry | Not listed | |
| Condition Monitoring | Not listed | |
| Digital Twin | Not listed | |
| Drone Inspection | Not listed | |
| Engineering Design | Not listed | |
| Inspection Automation | Not listed | |
| Inspection Checklists | Not listed | |
| LiDAR Processing | Not listed | |
| Offline Field App | Not listed | |
| Power Line Inspection | Not listed | |
| Predictive Maintenance | Not listed | |
| Preventive Maintenance | Not listed | |
| Safety and Compliance | Not listed | |
| SCADA and IoT Integration | Not listed | |
| Spare Parts Inventory | Not listed | |
| Work Orders | Not listed | |
Who CIVA and Power Factors suit
Power Factors fits field teams better than CIVA.
| Audience | CIVA | Power Factors |
|---|---|---|
| Field Teams | 2/10Engineers model a specimen, probe, and flaw on the desktop before an inspection is run on hardware, and the product does not store inspection records or work orders for crews on site. | 8/10Technicians get a mobile app with asset history, inspections, photos, job hazard analysis, and offline work-order updates at remote plants. |
| Energy Companies | 9/10CEA and EXTENDE name energy and nuclear as core sectors, and the software has dedicated tools for steam generator tubes, welds and nozzles. | 10/10Unity is built only for renewable generators, covering solar, wind, battery storage, and hybrid plants from SCADA through commercial settlement. |
| Enterprise | 8/10CEA describes the typical customer as a large industrial company, served with network licences and maintenance contracts. | 9/10The vendor reports 600-plus customers and more than 310 gigawatts under management, and the product is sold as a multi-module enterprise project. |
| Maintenance Teams | 7/10Structural health monitoring, probability-of-detection curves, and inspection simulation help reliability engineers qualify NDT, but it does not manage work orders or asset registries. | 8/10Field service covers preventive, corrective, and emergency work orders, checklists, parts, and condition-based triggers from performance data. |
| Small Business | 2/10Quote-only specialist licences and a steep learning curve make it a poor fit for small firms without NDT modelling experts. | 2/10Reviewers say rooftop installers, single sites, and small teams would pay for far more system than they need. |
| Utilities | 8/10Modules include eddy-current inspection of steam-generator tubes plus welds, nozzles, and guided waves, which are inspection methods used on power-plant equipment. | 8/10Independent power producers and utilities use it for utility-scale fleets and grid-code plant control, though it is not a transmission and distribution network tool. |
| Education | 7/10CIVA Education is a simplified edition built for universities and NDT training centres. | Not rated |
| Engineering Firms | 8/10EXTENDE sells consulting studies and inspection design work built on CIVA for engineering and qualification projects. | Not rated |
| Freelancers | 3/10Modules can be purchased or rented, but there is no self-serve checkout and the notes say accurate models require NDT and physics expertise. | Not rated |
| Manufacturing | 7/10CEA lists manufacturing, aeronautics and probe manufacturers among CIVA's users, who use it for inspection design and probe development. | Not rated |
| Mid-Market | Not rated | 3/10Independent reviews say the suite is impractical below utility scale because pricing is quote-only and SCADA is a commissioned engineering project. |
| Operations Teams | Not rated | 9/10Remote operations centers get fleet-to-device SCADA, loss categorization, and dispatch tied to asset criticality. |
| Startups | 2/10There is no public price, trial, or download, and forum users reported they could not find how to buy this specialist NDT simulation tool. | Not rated |
Which One Should You Choose?
Why choose CIVA

- Higher Support score (7/10 vs 6/10)
- Includes Engineering Simulation, which Power Factors lacks
Why choose Power Factors

- Higher Integration score (8/10 vs 5/10)
- Higher Scalability score (9/10 vs 6/10)
- Better fit for field teams (8/10 vs 2/10)
Pros & Cons
CIVA

Pros
- Covers ultrasonic, eddy current, radiography with CT, guided wave, SHM and thermography in one interface, so teams can compare inspection methods on the same part.
- CIVA 2025 gives every UT user finite element tools alongside semi-analytical models, so results can be cross-validated without buying a separate FEM package.
- Strong statistical tools: POD curves, PFA and ROC analysis, metamodels and Sobol sensitivity indices support inspection qualification work.
- A Python API (CIVA Script) and a Data Science module allow automated parametric campaigns and ML classifier training on simulated plus real data.
- A Swedish Radiation Safety Authority report described it as the most commercially successful NDT simulation software, and CEA publishes validation studies.
- EXTENDE also offers training (1,700+ people trained, Qualiopi-certified) and consulting studies on top of the licence.
Cons
- No public pricing, trial or download. NDT.net forum users, including students, reported they could not even find how to buy it.
- It is a specialist expert tool: building accurate models requires NDT and physics knowledge.
- It does not cover asset registries, work orders or inspection record management, so it has to sit alongside other systems.
- It has almost no presence on review sites: the SourceForge listing has no user reviews, so independent user feedback is scarce.
- Updates depend on an active maintenance contract.
Power Factors

Pros
- One vendor covers local and central SCADA, plant control, battery energy management, performance analytics, field work orders, and invoicing for solar, wind, and storage.
- SCADA accepts multi-vendor plants over IEC 61850, IEC 60870-5-104, DNP3, Modbus, and OPC-UA, so mixed OEM fleets do not need a separate monitor per brand.
- Asset performance management ranks losses such as soiling, degradation, and curtailment and can open field work from those events, which Origis Energy uses to chase plant performance.
- Field technicians can complete inspections, photos, and work orders offline, then sync when service returns, which matters at remote renewable sites.
- The vendor publishes ISO 27001, ISO 27017, and ISO 27019 certificates and says SCADA is built toward NERC CIP, NIS2, and IEC 62443.
Cons
- No public prices, plan comparison, or free trial, so cost is unknown until a sales quote.
- SCADA and plant controllers are designed, factory-tested, and commissioned per site, so rollout is an engineering project rather than a software install.
- Independent 2026 reviews describe a high learning curve and say the suite is a poor fit for a single small plant or a team that only needs work orders.
- Public user reviews are almost absent: a Gartner Peer Insights page for UNITY had no reviews, and Capterra showed no reviewer ratings for the PowerFactors listing.
- The vendor's own Unity page says the REMI intelligence layer is still coming to monitoring and control, so agent-style automation is not yet across the whole suite.
Not sold on either?
Frequently Asked Questions
Power Factors scores higher on our Industrial & Infrastructure Software criteria: 6.8/10 against 6/10 for CIVA. The largest gap is in Integration: 5/10 for CIVA and 8/10 for Power Factors.
No, neither CIVA nor Power Factors lists a free plan.
Power Factors is the better fit for field teams: we rate it 8/10 for them, against 2/10 for CIVA.
CIVA has Engineering Simulation, which Power Factors lacks.




